Here's the finished ceiling/store. Well, not "finished" in the sense that the doors are opened tomorrow, more, "finished" in the sense that I'm done with all of the projects I was hired to do. There is still a plethora of things left to be accomplished, but those will be handled primarily by other people. My tasks were:
- Replace ceiling.
- Replace all door locks.
- Build out new window sills (those large windows on the left side of the pictures.)
- Build playroom walls (those half walls at the back of the store).
- Build out display platforms in front windows.
- Repair the office walls (the room on the other side of the orange wall).
- Replace/hang doors and hardware (4 ea).
- Install baseboard trim (dark green stripe all the way around the store.) 360 linear ft.
- Install lights in bathrooms.
- Repair window/door trims.
- Repair walls.
- A bunch of misc that just came up while being there.
The original completion date for all these projects to be done was 2/20/08. I started 1/5/08. On 1/12/08 I was told the painters were starting earlier than expected and I only had 10(ish) days to complete the majority of the projects (esp sense they had to paint the baseboard, walls, window sills, etc.). The last major project I did was the ceiling tiles, which I finished Thursday night/Friday morning.